✨ New Arrivals Just Dropped!Explore
Hidden Trash Cabinet Wood Project Plan
HomeStore

Hidden Trash Cabinet Wood Project Plan

Hidden Trash Cabinet Wood Project Plan

$4.01

Original: $11.45

-65%
Hidden Trash Cabinet Wood Project Plan

$11.45

$4.01

The Story

Hide your trash inside this great looking country cabinet. Pattern includes complete materials list and assembly instructions. (Dimensions: 13.25" Deep X 19" Wide X 35" Tall)
More Info
DESCRIPTION:
CABINET WITH A HIDDEN TRASH CAN AND DRAWER WILL HOLD 36 QT. TRASH CAN (MEASURING 9 3/4" X 16" X 21" TALL)

DIMENSIONS:
13-1/4" DEEP X 19" WIDE X 35" TALL

WOOD:
#1 SELECT GRADE PINE OR HARDWOOD (KNOT-FREE) - OR IF YOU DON'T MIND THE LOOK OF KNOTS, USE A LOWER COST #2 GRADE LUMBER.
(TAKES: ONE 1 X 12 X 3' LONG BOARD
SIX 1 X 6 X 8' LONG BOARDS
ONE 1/4" DIA. X 2-1/4" LONG DOWEL
ONE 18" X 30" SHEET OF 1/8" MASONITE)

SAW:
TABLE SAW, SCROLL SAW OR BAND SAW

WINFIELD PARTS:
(3) #KN15 (1-1/2" DIA. WOODEN KNOBS)
(1) #BHNG2 (1-1/2" X 1-1/2" HINGES - NEED TWO AND THERE ARE FOUR IN
A PKG.
(1) #PLG375 (WOODEN PLUGS)

KEYWORDS
TRASH CABINET, BIN, HIDDEN

Description

Hide your trash inside this great looking country cabinet. Pattern includes complete materials list and assembly instructions. (Dimensions: 13.25" Deep X 19" Wide X 35" Tall)
More Info
DESCRIPTION:
CABINET WITH A HIDDEN TRASH CAN AND DRAWER WILL HOLD 36 QT. TRASH CAN (MEASURING 9 3/4" X 16" X 21" TALL)

DIMENSIONS:
13-1/4" DEEP X 19" WIDE X 35" TALL

WOOD:
#1 SELECT GRADE PINE OR HARDWOOD (KNOT-FREE) - OR IF YOU DON'T MIND THE LOOK OF KNOTS, USE A LOWER COST #2 GRADE LUMBER.
(TAKES: ONE 1 X 12 X 3' LONG BOARD
SIX 1 X 6 X 8' LONG BOARDS
ONE 1/4" DIA. X 2-1/4" LONG DOWEL
ONE 18" X 30" SHEET OF 1/8" MASONITE)

SAW:
TABLE SAW, SCROLL SAW OR BAND SAW

WINFIELD PARTS:
(3) #KN15 (1-1/2" DIA. WOODEN KNOBS)
(1) #BHNG2 (1-1/2" X 1-1/2" HINGES - NEED TWO AND THERE ARE FOUR IN
A PKG.
(1) #PLG375 (WOODEN PLUGS)

KEYWORDS
TRASH CABINET, BIN, HIDDEN
Hidden Trash Cabinet Wood Project Plan | The Winfield Collection