✨ New Arrivals Just Dropped!Explore
Garden Arbor Wood Project Plan
HomeStore

Garden Arbor Wood Project Plan

Garden Arbor Wood Project Plan

$6.81

Original: $19.45

-65%
Garden Arbor Wood Project Plan

$19.45

$6.81

The Story

This stylish Garden Arbor will surely enhance the beauty of any yard or garden area. Our full-size pattern includes complete list of materials and assembly instructions. Optional Bench pattern included to turn the arbor into a handy seating area.

(Dimensions: 93" Tall X 47" Wide, Seat 20" Deep)

More Info
DIMENSIONS:
93" TALL X 47" WIDE AND SEAT IS 20" DEEP
41" INSIDE MEASUREMENT

WOOD
SELECT #1 CEDAR (KNOT-FREE) - IF YOU DON'T MIND THE LOOK OF KNOTS, USE A LOWER COST #2 GRADE.
ONE - 1 X 2 X 4' LONG BOARD
TWO 1 X 2 X 8' LONG BOARD
NINE 2 X 4 X 8' " "
TWO 2 X 10 X 6' " "
SEAT OPTION: TWO 1 X 6 X 8' LONG BOARDS
TWO 2 X 4 X 8' LONG BOARDS

SAW:
TABLE SAW OR CIRCULAR SAW, BAND SAW, HAND-HELD SABRE SAW

PARTS AVAILABLE:
#YF12KIT - HARDWARE KIT

Description

This stylish Garden Arbor will surely enhance the beauty of any yard or garden area. Our full-size pattern includes complete list of materials and assembly instructions. Optional Bench pattern included to turn the arbor into a handy seating area.

(Dimensions: 93" Tall X 47" Wide, Seat 20" Deep)

More Info
DIMENSIONS:
93" TALL X 47" WIDE AND SEAT IS 20" DEEP
41" INSIDE MEASUREMENT

WOOD
SELECT #1 CEDAR (KNOT-FREE) - IF YOU DON'T MIND THE LOOK OF KNOTS, USE A LOWER COST #2 GRADE.
ONE - 1 X 2 X 4' LONG BOARD
TWO 1 X 2 X 8' LONG BOARD
NINE 2 X 4 X 8' " "
TWO 2 X 10 X 6' " "
SEAT OPTION: TWO 1 X 6 X 8' LONG BOARDS
TWO 2 X 4 X 8' LONG BOARDS

SAW:
TABLE SAW OR CIRCULAR SAW, BAND SAW, HAND-HELD SABRE SAW

PARTS AVAILABLE:
#YF12KIT - HARDWARE KIT
Garden Arbor Wood Project Plan | The Winfield Collection